⚡ Certified Solar & Heat Pump Hardware Diagnostics • Verified Against 2026 Engineering Specs
VoltFaults
Fault 105High⚡ Pro Only (No Cover Open)■ Manual Action / Lockout• Verified 2026-11-13

Sungrow Fault 105: SPI Auto-Test / Grid Protection Self-Check Failure

Affected Models: Sungrow SG3.0-20RT, SG33-110CX, and SH5.0-10RT Hybrid Series

Owner Action
Pre-Check + Pro Call
Keep metal covers closed
Auto-Recovery
No (Latched Fault)
Requires reset or repair
Est. Repair Cost
$150 – $300 (installer commissioning check); $0 under warranty RMA if hardware fails
Warranty may cover parts
Diag / Fix Time
45–90 minutes installer commissioning or diagnostics
Grid Protection Auto-Test & Compliance

⚡ Quick Engineering Answer

Sungrow • Fault 105

Sungrow Fault 105 indicates a Grid-Side Protection Self-Check (SPI Auto-Test) failure—mandatory under European grid standards such as Italy's CEI 0-21—or an internal EEPROM parameter storage fault on select SH hybrid firmware. Homeowners should perform one external reboot and contact their installer to re-run the auto-test or verify regional grid codes.

Recovery Behavior:Remains latched until the installer successfully re-runs the regional SPI/grid-protection Auto-Test routine or resolves underlying grid/relay hardware faults.
SCHEMATIC // Sungrow Fault 105 — Hybrid PV + Storage Inverter Architecture
PERIMETER: SEALED ENCLOSURE
Sungrow Fault 105: Smart Meter, BMS/RS485 & Portal Link System DiagramHV DCACSEALED CHASSIS — PRO ONLYPV Strings & DCMC4 / AFCI / DC SPDDC Switch & FusesMPPT & CoolingBoost / HeatsinkFans & NTC ArrayPower Bridge & DSPIGBT / DC-Link CapsEEPROM / Dual-CPUAC Relays & GridL-N / Freq PLL / SPDIsolator & BreakerPE Earth & RisoRCMU / GFCI / GFDIInsulation ResistanceBattery & BMS LinkDC Fuse / BMS CANLV/HV Bus CutoffComms & CT MeterRS485 / Wi-Fi / USBFirmware & ProfileActive Fault ZoneSafety BoundaryFAULT TARGET HIGHLIGHTED
Highlighted Fault Node
Smart Meter, BMS/RS485 & Portal Link
Signal / Power Path
Telemetry Bus, CT Clamp / RS485 & Gateway Module
Safety Access Line
Sealed Chassis — Grid Protection Self-Test Logic / Parameter Memory

📊 Technical Specification & Trigger Matrix

Official Manual Definition
The automated pre-connection grid protection relay and trip-time verification routine timed out or failed, blocking utility grid export.
Trigger Threshold
Auto-Test trip time deviation beyond grid-code tolerance, or EEPROM CRC mismatch
Recovery Window
Stays blocked until Auto-Test passes or parameters are re-initialized
Subsystem Affected
Grid Protection Self-Test Logic / Parameter Memory
Warranty Outlook
Medium (Misconfigured country code excluded; relay/EEPROM failure covered)

How Sungrow Fault 105 Triggers

Several national electricity regulations—most notably Italy's CEI 0-21 (SPI Interface Protection System)—require solar inverters to execute an automated self-diagnostic sequence (Auto-Test) verifying over/undervoltage and over/underfrequency trip thresholds and relay opening times in milliseconds prior to grid commissioning or parameter changes. Sungrow Fault 105 triggers when this SPI Auto-Test fails to complete within statutory time limits or measures out-of-spec relay response.

On specific Sungrow SH5.0RT–SH10RT firmware variants outside CEI 0-21 regions, Fault 105 can also appear when non-volatile EEPROM configuration storage encounters a parameter read/write checksum mismatch. Because running SPI Auto-Tests, unlocking Grid Guard settings, and re-writing country grid parameters require installer permissions in iSolarCloud, technician involvement is needed whenever an external reboot does not clear the fault.

🔀 Hardware & Series Differences

SG / SH Units (CEI 0-21 & European Grid Codes)
SPI Auto-Test / Grid Protection Relay Self-Check Failure

Triggered if voltage/frequency auto-test trips time out, grid drops mid-test, or wrong country code (Italy CEI 0-21) was accidentally selected.

SH5.0RT–SH10RT (Select Firmware Builds)
EEPROM / Parameter Storage Fault

Occurs if power drops during parameter write or firmware update, corrupting stored protection tables.

🔍 Observable Symptoms

  • •Inverter refuses to enter 'Run' / export mode after installation, grid outage, or firmware upgrade.
  • •iSolarCloud logs Fault 105 during startup self-testing or mid-way through an Auto-Test routine.
  • •Status LED remains flashing red with zero export to the public utility grid.
  • •May appear if an installer outside Italy accidentally selected CEI 0-21 during quick setup.

⚙️ Ranked Root Causes

Wrong country grid code selected (e.g., CEI 0-21 outside Italy) or incomplete Auto-TestHigh

Selecting a region that requires mandatory SPI Auto-Test without running or completing the commissioning wizard leaves the inverter locked in Fault 105.

Unstable utility grid voltage or frequency fluctuations interrupting Auto-TestMedium

Grid dips or surges occurring during the multi-minute Auto-Test cycle cause the test timer to fail.

Power interruption during firmware/parameter save corrupting EEPROM storageMedium

Cutting DC/AC power while writing grid parameters corrupts stored safety tables.

Slow or sticking internal AC safety relay failing millisecond open-time checkLow

Mechanical relay wear fails the strict trip-time verification required by protection standards.

🔄 Safe Shutdown & Reset Sequence Flow

Follow strict step order left-to-right
1AC ISOLATE
Switch Off AC Solar Breaker

Turn OFF the external AC breaker supplying the inverter.

2AC ISOLATE
Rotate External DC Switch to OFF for 10 Minutes

Turn DC (and hybrid battery breaker) OFF and wait 10 minutes for internal memory and capacitors to fully reset.

3RESTORE & BOOT
Restore DC, Then AC Power

Switch DC ON first, then AC ON, and wait 5 minutes for startup self-tests to finish.

⚠️

High-Voltage / Refrigerant Safety Boundary: Pro Service Split

Steps tagged "Homeowner Safe" below are strictly external read-only or external breaker inspections. Steps tagged "Licensed Technician" involve energized DC/AC bus voltages, isolation testing, or sealed refrigerant circuits—never attempt those steps without certification.

External Safe Zone
Display/App • AC/DC Switches • Airflow
● HOMEOWNER PRE-CHECKS STOP HERE
ENCLOSURE BARRIER
400–1000V DC Bus
✕ DO NOT OPEN COVERS
Internal Chassis (Pro)
Bus Capacitors • IGBT • Relays • Riso
⚡ LICENSED DISPATCH REQUIRED

🔧 Interactive Step-by-Step Diagnostic Checklist

Progress: 0 / 3 Completed
1

Check Country Code & Commissioning Status in iSolarCloud

Homeowner Safe

Open iSolarCloud > Device Information and check which Country / Grid Standard is active, plus whether Fault 105 began right after initial install or a firmware update.

✓ Expected ResultSeeing an unexpected country code (e.g., CEI 0-21 in a non-Italian site) immediately explains the Fault 105 block.
→ If Fault PersistsDo not attempt to force-change protected grid settings without installer authorization.
2

Perform One External Cold Power Cycle

Homeowner Safe

Turn AC and DC isolators off for 10 minutes and restart once to rule out a transient startup self-test glitch.

✓ Expected ResultIf grid fluctuations caused a one-time test abort, the inverter passes self-check upon reboot.
→ If Fault PersistsContact your solar installer to re-run commissioning or update grid parameters.
3

Verify Country Setting, Reflash Firmware & Re-Run SPI Auto-Test

Licensed Technician

Technician logs in with iSolarCloud installer credentials, confirms the exact regional grid standard, flashes latest firmware if EEPROM mismatch exists, and executes the complete Auto-Test sequence while verifying AC terminal voltage stability.

✓ Expected ResultAuto-Test passes all over/undervoltage and frequency checkpoints and clears Fault 105.
→ If Fault PersistsExport Auto-Test failure log to Sungrow Technical Support for relay/control-board warranty RMA.

📋 Ready-to-Send Technician Fault Brief

Completed safe checks without clearing Fault 105? Copy this structured engineering summary for your installer or OEM RMA ticket.

Request Certified Tech Dispatch ↓

🧰 Field Reference: What Your Technician Will Inspect

For homeowner safety, DIY replacement tools are disabled on this fault code. Your certified electrician or technician should bring:

  • •Licensed Installer with iSolarCloud Commissioning Credentials
  • •True-RMS Multimeter (for AC Grid Stability Verification)
⚠️
High Hazard AlertLicensed Electrician Required

Don't Risk High-Voltage Shock with Sungrow Fault 105

This fault involves internal bridge or DC intermediate capacitor stages. Under NEC & UL guidelines, probing energized solar conductors can cause lethal arc flash. Get competitive quotes from licensed solar electricians in your postal area:

✓ No obligation quotes✓ Pre-screened NABCEP certified contractors✓ 100% Free dispatch

❓ Frequently Asked Questions

Why did Sungrow Fault 105 appear right after my system was installed?

In regions requiring SPI Auto-Test (like Italy's CEI 0-21), the installer must run and complete the automated grid protection self-test routine before export is permitted—or an incorrect country standard was chosen.

Can a homeowner run the SPI Auto-Test in iSolarCloud?

No. Grid protection parameters and statutory auto-test commissioning tools are restricted to installer accounts for electrical compliance.

Does Fault 105 mean my solar panels are damaged?

No. Fault 105 is purely an AC grid-protection self-test or inverter parameter storage issue; the rooftop solar panels are unaffected.

Related Sungrow Fault Codes

VF
VoltFaults Engineering Review Board✓ Verified Technical Standards• Updated November 2026

Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).

Emergency Installer Dispatch Network

Can't Resolve Your Hardware Fault?

High-voltage DC solar systems and heat pumps require certified technicians. Connect with NABCEP-certified solar electricians and F-Gas certified heat pump specialists in your region.

Free quotes • No commitment • Local certified technicians