⚡ Certified Solar & Heat Pump Hardware Diagnostics • Verified Against 2026 Engineering Specs
VoltFaults
Error F26Critical⚡ Pro Only (No Cover Open)↻ Auto-Recovers When Cleared• Verified 2026-11-13

Deye Error F26: DC Busbar Unbalanced (Half-Bus Voltage Fault)

Affected Models: Deye SUN-SG04LP1-US (Split-Phase), SUN-SG04LP3 (3-Phase), SG01HP3 & SUN-G03 String

Owner Action
Pre-Check + Pro Call
Keep metal covers closed
Auto-Recovery
Yes (Self-Clears)
Resumes after cause clears
Est. Repair Cost
$220 - $680 USD
Warranty may cover parts
Diag / Fix Time
60 - 150 mins
Internal Split DC Bus Capacitors

⚡ Quick Engineering Answer

Deye • Error F26

Deye Error F26 means the inverter's split positive (+BUS) and negative (-BUS) internal high-voltage DC capacitor banks fell significantly out of voltage balance. On three-phase units, heavily asymmetrical single-phase backup loads or severe utility phase drops can contribute, while repeated F26 when unloaded points to failed internal balancing resistors or electrolytic bus capacitors requiring service.

Recovery Behavior:Rare transient imbalances clear after full 5-minute shutdown; repeated F26 lockouts point to aging bus capacitors, severe phase load asymmetry, or bridge damage.
SCHEMATIC // Deye Error F26 — Hybrid PV + Storage Inverter Architecture
PERIMETER: SEALED ENCLOSURE
Deye Error F26: Internal Power Bridge, Capacitors & DSP System DiagramHV DCACSEALED CHASSIS — PRO ONLYPV Strings & DCMC4 / AFCI / DC SPDDC Switch & FusesMPPT & CoolingBoost / HeatsinkFans & NTC ArrayPower Bridge & DSPIGBT / DC-Link CapsEEPROM / Dual-CPUAC Relays & GridL-N / Freq PLL / SPDIsolator & BreakerPE Earth & RisoRCMU / GFCI / GFDIInsulation ResistanceBattery & BMS LinkDC Fuse / BMS CANLV/HV Bus CutoffComms & CT MeterRS485 / Wi-Fi / USBFirmware & ProfileActive Fault ZoneSafety BoundaryFAULT TARGET HIGHLIGHTED
Highlighted Fault Node
Internal Power Bridge, Capacitors & DSP
Signal / Power Path
IGBT Bridge, DC-Link Capacitors, EEPROM & Dual-CPU
Safety Access Line
Sealed Chassis — Split DC Bus Electrolytic Capacitors & Half-Bridge Drivers

📊 Technical Specification & Trigger Matrix

Official Manual Definition
Asymmetry exceeded safety tolerance between upper (+Bus) and lower (-Bus) internal high-voltage DC bus capacitors.
Trigger Threshold
Voltage difference |+Bus − −Bus| exceeds controller balance limit (~30V–50V split)
Recovery Window
Full 5-minute external isolation reset tests transient clearance; permanent board wear latches
Subsystem Affected
Split DC Bus Electrolytic Capacitors & Half-Bridge Drivers
Warranty Outlook
Internal capacitor / power PCB defects covered under Deye 5/10-year inverter warranty

How Deye Error F26 Triggers

Inside Deye split-phase (120/240V SG04LP1-US) and three-phase (SG04LP3 / SG01HP3 / SUN-G03) inverters, the AC bridge switches across a split dual-polarity DC bus (+BUS to Neutral, Neutral to -BUS, totaling ~400V–800V DC combined). Healthy operation expects +BUS and -BUS voltages to stay closely matched within ~20–30V.

Error F26 (DC_Bus_Unbalance) trips whenever those two halves drift sharply apart. Real-world causes include severe asymmetric overload on one half-leg during off-grid backup (e.g., maxing L1 to 100% while L2 draws zero on split-phase/three-phase units), failed internal half-bridge IGBTs, or drying electrolytic DC bus capacitors after years in warm rooms.

🔀 Hardware & Series Differences

Split-Phase 120/240V & Three-Phase Hybrids (SG04LP1-US / SG04LP3)
Heavy single-leg reactive/DC-component backup load or weak capacitor bank

Verify neutral terminal integrity and check if heavy appliances load strictly L1 without balancing L2/L3.

Standalone / Grid-Tied Unloaded Trips
Aged DC electrolytic bus capacitors, bad balancing resistors, or IGBT bridge fault

Consistent F26 with all AC backup loads switched OFF demands workshop PCB repair or RMA.

🔍 Observable Symptoms

  • •Inverter stops power export and backup loads abruptly with Error F26.
  • •Often surfaces under heavy single-leg off-grid appliance loads (e.g., half-wave rectified hair dryers or welders).
  • •Sometimes triggers alongside F56 DC Bus Low or F20 DC Overcurrent.
  • •Locks out repeatedly within seconds of closing DC/battery breakers.

⚙️ Ranked Root Causes

Heavy asymmetric or half-wave rectified load on off-grid split-phase / 3-phase Backup portHigh

Half-wave appliances (certain heaters/power tools) draw current cleanly from only one DC bus capacitor bank.

Severe single-phase grid sag or loose Neutral wire at AC Grid / Backup blockMedium

High-resistance Neutral drop shifts midpoint potential across +BUS and -BUS.

Degraded electrolytic DC bus capacitors or open internal balancing resistorMedium

Heat stress dries capacitor electrolyte over 5+ years, lowering capacitance on one bus rail.

Faulted DC-DC converter leg or asymmetric IGBT switchingLow

Misfiring gate driver pumps energy unevenly onto upper or lower bus half.

🔄 Safe Shutdown & Reset Sequence Flow

Follow strict step order left-to-right
1AC ISOLATE
Switch Off Backup Load Sub-Panel Breakers

Remove potentially asymmetrical off-grid appliances before testing reboot.

2DC / BATT OFF
Turn Off PV, Battery & AC Isolators Completely (5 Mins)

Wait 5 full minutes so high-voltage split DC capacitors bleed uniformly down to 0V.

3RESTORE & BOOT
Restart Battery -> AC -> PV & Test Unloaded

If F26 persists cleanly with all backup loads disconnected, book inverter hardware repair.

⚠️

High-Voltage / Refrigerant Safety Boundary: Pro Service Split

Steps tagged "Homeowner Safe" below are strictly external read-only or external breaker inspections. Steps tagged "Licensed Technician" involve energized DC/AC bus voltages, isolation testing, or sealed refrigerant circuits—never attempt those steps without certification.

External Safe Zone
Display/App • AC/DC Switches • Airflow
● HOMEOWNER PRE-CHECKS STOP HERE
ENCLOSURE BARRIER
400–1000V DC Bus
✕ DO NOT OPEN COVERS
Internal Chassis (Pro)
Bus Capacitors • IGBT • Relays • Riso
⚡ LICENSED DISPATCH REQUIRED

🔧 Interactive Step-by-Step Diagnostic Checklist

Progress: 0 / 4 Completed
1

Test Unloaded Reboot With Backup Loads Turned Off

Homeowner Safe

Shut off all Backup sub-panel circuit breakers cleanly, turn PV, Battery, and AC breakers OFF for 5 full minutes, then power inverter back ON unloaded.

✓ Expected ResultDetermines quickly if a household appliance caused half-bus imbalance.
→ If Fault PersistsImmediate F26 completely unloaded proves internal bus hardware/capacitor failure.
2

Inspect Split-Phase / 3-Phase Load Balance in Solarman

Homeowner Safe

Review L1, L2, and L3 wattage graphs in Solarman around the F26 event to see if heavy loads sat heavily skewed onto one leg or used half-power settings (e.g., hair dryer Low setting).

✓ Expected ResultIdentifies load imbalance or DC-injecting appliances cleanly.
→ If Fault PersistsShift asymmetric loads evenly across phases or remove half-wave rectifier loads off backup.
3

Inspect Neutral Continuity, Torque & Grid Balance

Licensed Technician

Isolate AC/DC safely, verify Grid & Backup Neutral lugs for crisp tightness (high-resistance N causes wild bus shift!), and verify L1/L2/L3 phase-to-neutral voltages.

✓ Expected ResultEliminates external floating neutral faults immediately.
→ If Fault PersistsBoot inverter with AC output unplugged to inspect internal bus behavior.
4

Verify +Bus/-Bus Readings & Initiate Power Board RMA

Licensed Technician

Check internal engineering bus voltages via Deye Cloud remote support / LCD info; submit serial & fault history for capacitor/power stage replacement if half-bus delta exceeds spec unloaded.

✓ Expected ResultRestores symmetrical +/- DC bus stability across full load ranges.
→ If Fault PersistsInstall replacement inverter power board under Deye warranty.

📋 Ready-to-Send Technician Fault Brief

Completed safe checks without clearing Error F26? Copy this structured engineering summary for your installer or OEM RMA ticket.

Request Certified Tech Dispatch ↓

🧰 Field Reference: What Your Technician Will Inspect

For homeowner safety, DIY replacement tools are disabled on this fault code. Your certified electrician or technician should bring:

  • •True-RMS Multimeter & Phase Rotation Meter
  • •Insulated Torque Screwdriver (Neutral Check)
  • •Deye Cloud Engineering Bus Log Access
⚠️
Critical Hazard AlertLicensed Electrician Required

Don't Risk High-Voltage Shock with Deye Error F26

This fault involves internal bridge or DC intermediate capacitor stages. Under NEC & UL guidelines, probing energized solar conductors can cause lethal arc flash. Get competitive quotes from licensed solar electricians in your postal area:

✓ No obligation quotes✓ Pre-screened NABCEP certified contractors✓ 100% Free dispatch

❓ Frequently Asked Questions

Can using a cheap hair dryer or space heater on LOW trigger Deye Error F26?

Surprisingly yes! Many 2-speed hair dryers and heat guns drop power on Low simply by switching a single diode in line—drawing current off only ONE half of the AC sine wave and unbalancing the inverter's split DC bus!

Is Error F26 fixable by updating firmware?

Only rarely if minor sampling bugs occurred; persistent F26 when unloaded almost always requires power-stage capacitor or balancing resistor board replacement.

Why must I wait 5 minutes before turning power back on for F26?

Split high-voltage electrolytic capacitors bleed slowly through high-ohm resistors; restarting early keeps the uneven residual charge intact and trips F26 instantly again.

Related Deye Fault Codes

VF
VoltFaults Engineering Review Board✓ Verified Technical Standards• Updated November 2026

Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).

Emergency Installer Dispatch Network

Can't Resolve Your Hardware Fault?

High-voltage DC solar systems and heat pumps require certified technicians. Connect with NABCEP-certified solar electricians and F-Gas certified heat pump specialists in your region.

Free quotes • No commitment • Local certified technicians