Error F23High⚡ Pro Only (No Cover Open)↻ Auto-Recovers When Cleared• Verified 2026-11-13

Deye Error F23: GFCI Transient Leakage Current Fault

Affected Models: Deye SUN-SG04LP1, SUN-SG04LP3, SUN-SG05LP1 & SUN-G03 String Inverters

Owner Action
Pre-Check + Pro Call
Keep metal covers closed
Auto-Recovery
Yes (Self-Clears)
Resumes after cause clears
Est. Repair Cost
$140 - $420 USD
Warranty may cover parts
Diag / Fix Time
45 - 120 mins
Transient Ground Leakage & RCMU

⚡ Quick Engineering Answer

Deye • Error F23

Deye Error F23 triggers when the inverter's residual current sensor catches a sudden transient leakage spike to ground (>30mA/60mA step shift) rather than continuous >300mA leakage (F16). Morning roof dew, wet panel backsheets, or shifting conduit moisture commonly trigger brief F23 drops. Monitor rain patterns safely; string megger testing requires an electrician.

Recovery Behavior:Auto-retries after 60 seconds when transient capacitance/dew leakage passes; repeating trips point to damaged PV cable insulation or grid earth faults.
SCHEMATIC // Deye Error F23 — Hybrid PV + Storage Inverter Architecture
PERIMETER: SEALED ENCLOSURE
Deye Error F23: PE Ground Bond, RCMU & Array Riso System DiagramHV DCACSEALED CHASSIS — PRO ONLYPV Strings & DCMC4 / AFCI / DC SPDDC Switch & FusesMPPT & CoolingBoost / HeatsinkFans & NTC ArrayPower Bridge & DSPIGBT / DC-Link CapsEEPROM / Dual-CPUAC Relays & GridL-N / Freq PLL / SPDIsolator & BreakerPE Earth & RisoRCMU / GFCI / GFDIInsulation ResistanceBattery & BMS LinkDC Fuse / BMS CANLV/HV Bus CutoffComms & CT MeterRS485 / Wi-Fi / USBFirmware & ProfileActive Fault ZoneSafety BoundaryFAULT TARGET HIGHLIGHTED
Highlighted Fault Node
PE Ground Bond, RCMU & Array Riso
Signal / Power Path
Rooftop Moisture Path, Differential Toroid & PE Earth
Safety Access Line
Sealed Chassis — Fast RCMU / GFCI Step Sensor & Array Capacitance

📊 Technical Specification & Trigger Matrix

Official Manual Definition
Internal GFCI/RCMU protection caught a sharp instantaneous step spike in AC/DC earth leakage current.
Trigger Threshold
Sudden transient leakage jump >30 mA / 60 mA / 150 mA step within milliseconds
Recovery Window
Auto-clears automatically after grid/PV stability timeout (~60s–180s)
Subsystem Affected
Fast RCMU / GFCI Step Sensor & Array Capacitance
Warranty Outlook
Internal toroid failure covered by warranty; damp roof connectors excluded

How Deye Error F23 Triggers

Even when average roof insulation appears healthy, international solar safety standards (IEC 62109-2) enforce dual leakage trips: F16 monitors slow total RMS current (>300 mA), whereas Error F23 (GFCI_Transient_OverCurr) reacts within milliseconds to any sudden jump in earth leakage (e.g., 30 mA, 60 mA, or 150 mA step spikes).

High-efficiency N-type or frameless glass panels sitting over damp metal roofing act like giant variable capacitors at sunrise: as solar voltage wakes abruptly through mist or morning rain puddles soaking wet MC4 junctions, transient earth currents spike across stray capacitance. On select legacy string models (G03), F23 may also signal phase imbalance. Occasional sunrise ticks shouldn't alarm you, yet repeated trips signal deteriorating wire splices needing insulation testing.

🔀 Hardware & Series Differences

Deye Hybrid LV & HV (SG04LP1 / LP3 / HP3)
Instantaneous residual leakage step jump detected via internal RCMU toroid

Often hits just once at damp dawn or right as heavy rain starts, then clears spontaneously.

Select SUN-G03 Three-Phase String Units
Instantaneous leakage spike or transient grid phase voltage imbalance

Verify steady PE earthing plus three-phase voltage stability.

🔍 Observable Symptoms

  • •Inverter disconnects briefly at misty dawn or light afternoon showers with Error F23.
  • •Logs clear themselves automatically within 2 minutes and return to Normal green operation.
  • •Frequent F23 logs precede eventual continuous F16 ground lockouts months later.
  • •Occasional clicking inside inverter chassis while weather shifts rapidly.

⚙️ Ranked Root Causes

Condensation or rain bridging compromised roof MC4 connectors momentarilyHigh

Dampness soaking poor roof splices causes brief leakage flashes as panel voltage ramps.

High stray capacitive leakage from large thin-film / glass arrays during rainMedium

Large total array surface area coupled to wet framing momentarily trips sensitive 30mA transients.

Weak Protective Earth (PE) ground wire or fluctuating utility neutralMedium

Noisy industrial utility grids shifting ground potential confuse step differential sensing.

Faulty internal RCMU / GFCI differential sensorLow

Fails false triggers even with dry isolated PV cables.

🔄 Safe Shutdown & Reset Sequence Flow

Follow strict step order left-to-right
1SEQUENCE STEP
Allow 3 Minutes for Automatic Recovery

Error F23 automatically retries synchronization once the momentary leakage jump settles.

2CHECK / VERIFY
Note Exact Time & Weather Pattern

Check Solarman event logs to confirm if F23 tracks early morning dew vs rainy spells.

3RESTORE & BOOT
Run 1-Min External Breaker Cycle If Frozen

Turn PV -> Battery -> AC switches OFF 60 seconds and restore cleanly.

⚠️

High-Voltage / Refrigerant Safety Boundary: Pro Service Split

Steps tagged "Homeowner Safe" below are strictly external read-only or external breaker inspections. Steps tagged "Licensed Technician" involve energized DC/AC bus voltages, isolation testing, or sealed refrigerant circuits—never attempt those steps without certification.

External Safe Zone
Display/App • AC/DC Switches • Airflow
● HOMEOWNER PRE-CHECKS STOP HERE
ENCLOSURE BARRIER
400–1000V DC Bus
✕ DO NOT OPEN COVERS
Internal Chassis (Pro)
Bus Capacitors • IGBT • Relays • Riso
⚡ LICENSED DISPATCH REQUIRED

🔧 Interactive Step-by-Step Diagnostic Checklist

Progress: 0 / 4 Completed
1

Monitor Sunrise & Rainfall Patterns in Solarman Logs

Homeowner Safe

Review the past 30 days of Error F23 alerts inside Solarman to determine whether trips happen solely at sunrise/rainy hours or under clear dry noon sunshine.

✓ Expected ResultConfirms damp weather-induced array capacitance/cable leaks cleanly.
→ If Fault PersistsRare isolated foggy dawn events that recover within minutes can be logged for annual service; daily trips need checking.
2

Test External PV Isolation Safely If F23 Repeats Under Dry Sun

Homeowner Safe

If F23 fires constantly under bone-dry weather, turn the external PV isolator OFF and observe whether inverter grid/battery mode stays alarm-free.

✓ Expected ResultProves rooftop strings cause the transients without false internal trips.
→ If Fault PersistsSchedule rooftop megger testing and earth impedance measurement.
3

Megger Individual Strings & Check Earth Bonding

Licensed Technician

Disconnect PV strings cleanly, run 500V/1000V insulation tests across PV+/PE and PV-/PE individually (watching initial settling currents), and test home PE ground impedance.

✓ Expected ResultFinds failing waterproof glands or marginal roof-rail earth straps cleanly.
→ If Fault PersistsConsult Deye regional firmware support on GFCI capacitance mode parameters if array surface area is massive.
4

Re-Make Suspect MC4 Plugs & Inspect RCMU Toroid

Licensed Technician

Lift loose roof MC4 wires out of roof puddles, replace non-compatible mated MC4 brands, verify tight PE lugs inside inverter, or service internal GFCI board if test passes cleanly without PV.

✓ Expected ResultMorning moisture startups transition smoothly with zero Error F23 ticks.
→ If Fault PersistsSwap faulty RCMU sensing board under warranty.

📋 Ready-to-Send Technician Fault Brief

Completed safe checks without clearing Error F23? Copy this structured engineering summary for your installer or OEM RMA ticket.

Request Certified Tech Dispatch ↓

🧰 Field Reference: What Your Technician Will Inspect

For homeowner safety, DIY replacement tools are disabled on this fault code. Your certified electrician or technician should bring:

  • •Solarman Historical Alert Logs
  • •1000V DC Megger Insulation Tester
  • •Earth Resistance & AC Leakage Clamp Meter
⚠️
High Hazard AlertLicensed Electrician Required

Don't Risk High-Voltage Shock with Deye Error F23

This fault involves internal bridge or DC intermediate capacitor stages. Under NEC & UL guidelines, probing energized solar conductors can cause lethal arc flash. Get competitive quotes from licensed solar electricians in your postal area:

✓ No obligation quotes✓ Pre-screened NABCEP certified contractors✓ 100% Free dispatch

❓ Frequently Asked Questions

Should I worry if Deye Error F23 shows up once on a rainy morning then clears itself?

An isolated transient step during heavy storms rarely means broken hardware, but frequent weekly F23 trips strongly hint at trapped moisture or mismatched MC4 brands slowly corroding on your roof.

How do F16 and F23 differ on Deye inverters?

F23 watches sudden millisecond leakage step jumps (like 30–60mA shifts as morning dew wakes panels), whereas F16 trips when total continuous ground leakage passes ~300 mA.

Can missing earthing on solar panel aluminum rails cause F23?

Inconsistent frame bonding or loose inverter PE wires create erratic ground potentials that sensitize differential leakage transformers easily.

Related Deye Fault Codes

VF
VoltFaults Engineering Review Board✓ Verified Technical Standards• Updated November 2026

Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).

Emergency Installer Dispatch Network

Can't Resolve Your Hardware Fault?

High-voltage DC solar systems and heat pumps require certified technicians. Connect with NABCEP-certified solar electricians and F-Gas certified heat pump specialists in your region.

Free quotes • No commitment • Local certified technicians