⚡ Certified Solar & Heat Pump Hardware Diagnostics • Verified Against 2026 Engineering Specs
VoltFaults
Error F34High⚡ Pro Only (No Cover Open)↻ Auto-Recovers When Cleared• Verified 2026-11-13

Deye Error F34: AC Overcurrent / Backup Overload Fault

Affected Models: Deye SUN-SG04LP1, SUN-SG04LP3, SG05LP1 & Select SUN-G03 String Models

Owner Action
Pre-Check + Pro Call
Keep metal covers closed
Auto-Recovery
Yes (Self-Clears)
Resumes after cause clears
Est. Repair Cost
$120 - $360 USD (if phase balancing needed)
Warranty may cover parts
Diag / Fix Time
30 - 90 mins
Backup Port Overload & AC Current

⚡ Quick Engineering Answer

Deye • Error F34

On Deye hybrid inverters (SG04LP1/LP3), Error F34 (AC_OverCurr_Fault / AC Overload) means power demanded on the Backup LOAD or AC port exceeded inverter continuous capacity—NOT Input Phase Sequence! (Note on select SUN-G03 string models, F34 maps to internal communication timeout). Safely switch off heavy appliances on your Backup sub-panel first.

Recovery Behavior:Auto-retries periodically once backup/AC load drops inside rated kW limits; hard output short circuits or internal comms timeouts require wiring inspection.
SCHEMATIC // Deye Error F34 — Hybrid PV + Storage Inverter Architecture
PERIMETER: SEALED ENCLOSURE
Deye Error F34: AC Protection Relays, Breaker & Grid System DiagramHV DCACSEALED CHASSIS — PRO ONLYPV Strings & DCMC4 / AFCI / DC SPDDC Switch & FusesMPPT & CoolingBoost / HeatsinkFans & NTC ArrayPower Bridge & DSPIGBT / DC-Link CapsEEPROM / Dual-CPUAC Relays & GridL-N / Freq PLL / SPDIsolator & BreakerPE Earth & RisoRCMU / GFCI / GFDIInsulation ResistanceBattery & BMS LinkDC Fuse / BMS CANLV/HV Bus CutoffComms & CT MeterRS485 / Wi-Fi / USBFirmware & ProfileActive Fault ZoneSafety BoundaryFAULT TARGET HIGHLIGHTED
Highlighted Fault Node
AC Protection Relays, Breaker & Grid
Signal / Power Path
Dual AC Isolation Relays -> Main Breaker -> Utility
Safety Access Line
Sealed Chassis — Backup LOAD Output Bridge & Per-Phase Current Limiter

📊 Technical Specification & Trigger Matrix

Official Manual Definition
AC output load on the Backup/UPS port exceeded continuous current ratings (or internal comms timeout on select string models).
Trigger Threshold
AC output current > 105%–125% continuous phase rating beyond allowed transient window
Recovery Window
Auto-restarts in ~30–60s once Backup load decreases; latches after repeat trips
Subsystem Affected
Backup LOAD Output Bridge & Per-Phase Current Limiter
Warranty Outlook
Normal overload protection (0% hardware failure); phase rebalancing is electrician scope

How Deye Error F34 Triggers

During normal grid-connected periods, external utility transfer switches carry substantial household wattage seamlessly—yet the moment utility grid collapses or inverter bypass limits activate, all connected appliances on the LOAD (Backup) port draw power strictly through the inverter's electronic current ceiling (Error F34).

In three-phase setups (SUN-SG04LP3), watch out for single-phase concentration: plugging a 5kW kettle, oven, and dryer onto L1 inside a 12kW three-phase inverter still overloads that single 4kW phase leg and throws F34 even when total system draw reads only 40%! Start by shedding non-essential backup loads externally before requesting an electrician to rebalance phases or install load-shedding smart contactors.

🔀 Hardware & Series Differences

Deye Hybrid LV & HV (SG04LP1 / SG04LP3)
AC_OverCurr_Fault / Backup EPS port continuous overload or single-leg phase overload

Verify both total inverter kW AND per-phase continuous amps on three-phase LP3 models.

Three-Phase Grid String (SUN-G03)
Internal communication timeout between MCU boards or AC current sensing error on select manuals

Requires 5-minute full power reset and firmware audit if no backup loads are attached.

🔍 Observable Symptoms

  • •Backup house circuits flicker OFF mid-blackout right after turning on a kettle, microwave, or heater.
  • •Touchscreen shows Error F34 and re-attempts output 30 seconds later.
  • •Solarman Load power graph spikes near phase limit right before outage.
  • •Single-phase breakers on L1 overload while L2 and L3 sit barely utilized.

⚙️ Ranked Root Causes

Running high-wattage thermal/motor loads simultaneously on Backup LOAD portHigh

Electric water heaters, ovens, and HVAC compressors exceed backup inverter kW budget.

Single-phase overload imbalance on three-phase SG04LP3 hybrid unitsHigh

3-phase hybrids generally cap each individual phase to roughly one-third (or half on 100% unbalance support) of total rating.

Grid Sell/Bypass relay limitation or downstream wiring fault pulling excess ampsMedium

High-resistance appliance fault or leaky heating element draws extra steady current.

Internal MCU-DSP communication timeout (SUN-G03 string models only)Low

Serial glitch inside grid-only units resets after clean 5-minute DC+AC shutdown.

🔄 Safe Shutdown & Reset Sequence Flow

Follow strict step order left-to-right
1SEQUENCE STEP
Switch Off Heavy Appliances on Backup Circuits

Unplug kettles, air fryers, space heaters, and turn off HVAC/boiler breakers.

2DC / BATT OFF
Turn Off Backup Load Sub-Breakers & Test Reboot

Wait 60 seconds or cycle PV/Battery/AC switches if F34 latched after multiple retries.

3RESTORE & BOOT
Restore Light Circuits Gradually

Bring essential lighting and Wi-Fi breakers back online while avoiding stacked high-wattage draws.

⚠️

High-Voltage / Refrigerant Safety Boundary: Pro Service Split

Steps tagged "Homeowner Safe" below are strictly external read-only or external breaker inspections. Steps tagged "Licensed Technician" involve energized DC/AC bus voltages, isolation testing, or sealed refrigerant circuits—never attempt those steps without certification.

External Safe Zone
Display/App • AC/DC Switches • Airflow
● HOMEOWNER PRE-CHECKS STOP HERE
ENCLOSURE BARRIER
400–1000V DC Bus
✕ DO NOT OPEN COVERS
Internal Chassis (Pro)
Bus Capacitors • IGBT • Relays • Riso
⚡ LICENSED DISPATCH REQUIRED

🔧 Interactive Step-by-Step Diagnostic Checklist

Progress: 0 / 4 Completed
1

Shed Non-Essential High-Wattage Loads on Backup Panel

Homeowner Safe

Turn off electric geysers, kitchen ovens, tumble dryers, or heat pumps fed from your solar Backup LOAD sub-panel, wait 60 seconds, and verify normal power returns.

✓ Expected ResultBackup outlets power back cleanly once total and per-phase wattage drops below nameplate spec.
→ If Fault PersistsShut off all Backup sub-breakers and test one clean inverter reboot unloaded.
2

Check Per-Phase Load Wattage in Solarman App

Homeowner Safe

Open live inverter telemetry in Solarman or the front LCD home diagram to view L1, L2, and L3 Load kW right before F34 occurred.

✓ Expected ResultSpots one heavily loaded single phase overloading a 3-phase inverter cleanly.
→ If Fault PersistsImmediate F34 with EVERY Backup breaker turned OFF points to shorted wiring or internal board issues.
3

Rebalance 3-Phase Circuits & Audit Essential vs Non-Essential Wiring

Licensed Technician

Redistribute heavy Backup outlets evenly across L1/L2/L3 (or shift heavy geysers/EV chargers back onto the Grid-Only non-backup side / SMART Load port configured for grid-on shed).

✓ Expected ResultEliminates nuisance F34 trips permanently during outages.
→ If Fault PersistsTest Backup field wiring insulation to ensure no hidden partial line-neutral short exists.
4

Verify Pass-Through Relay Limits & Internal AC Current CTs

Licensed Technician

Confirm grid pass-through current settings match breaker size, verify internal AC CT calibration against True-RMS clamp readings, and update SUN-G03 comms firmware if string unit shows F34 unloaded.

✓ Expected ResultMeasured load readings track real clamp amps with zero nuisance overcurrent lockouts.
→ If Fault PersistsService internal current transformer or control PCB.

📋 Ready-to-Send Technician Fault Brief

Completed safe checks without clearing Error F34? Copy this structured engineering summary for your installer or OEM RMA ticket.

Request Certified Tech Dispatch ↓

🧰 Field Reference: What Your Technician Will Inspect

For homeowner safety, DIY replacement tools are disabled on this fault code. Your certified electrician or technician should bring:

  • •AC True-RMS Clamp Meter (Per-Phase Load Audit)
  • •Backup Distribution Panel Load Schedule
  • •Smart Load Contactor / Shedding Schematic
⚠️
High Hazard AlertLicensed Electrician Required

Don't Risk High-Voltage Shock with Deye Error F34

This fault involves internal bridge or DC intermediate capacitor stages. Under NEC & UL guidelines, probing energized solar conductors can cause lethal arc flash. Get competitive quotes from licensed solar electricians in your postal area:

✓ No obligation quotes✓ Pre-screened NABCEP certified contractors✓ 100% Free dispatch

❓ Frequently Asked Questions

Does Deye Error F34 mean AC Input Phase Sequence Error?

No—that confusion sits on copied internet blogs. On Deye SG04LP1/LP3 hybrid units, F34 strictly signals AC Overcurrent / Backup Overload (whereas phase sequence errors map to grid-string codes or F22/F42 depending on firmware).

Why does my 12kW three-phase Deye trip F34 when my house uses only 4.5kW?

Because a 12kW three-phase hybrid typically limits any single phase (L1, L2, or L3) to ~4kW–6kW continuous! Putting too many heavy plugs onto L1 trips phase overcurrent early.

How can I prevent F34 automatically during blackouts?

Have your electrician move ovens, hot-water heaters, and pool pumps onto the non-backed-up Grid panel (or Deye's programmable Smart Load port, which drops them automatically when grid fails).

Related Deye Fault Codes

VF
VoltFaults Engineering Review Board✓ Verified Technical Standards• Updated November 2026

Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).

Emergency Installer Dispatch Network

Can't Resolve Your Hardware Fault?

High-voltage DC solar systems and heat pumps require certified technicians. Connect with NABCEP-certified solar electricians and F-Gas certified heat pump specialists in your region.

Free quotes • No commitment • Local certified technicians