SMA Event 6901: Self-Diagnosis Input B Defective (DC Stage)

Affected Models: SMA Sunny Boy (SB 3.0–6.0 / -US) & Sunny Tripower (STP 5.0–25TL)

Owner Action
Pre-Check + Pro Call
Keep metal covers closed
Auto-Recovery
No (Latched Fault)
Requires reset or repair
Est. Repair Cost
$0 - $520 USD
Warranty may cover parts
Diag / Fix Time
45 - 120 mins
DC Input B Boost & Sensor Diagnostics

⚡ Quick Engineering Answer

SMA Sunny Boy • Error 6901

SMA Event 6901 (Self-diagnosis: Input B defective) indicates that morning startup self-checks detected a defective boost semiconductor, freewheeling diode, or current sensor on PV Input B. Confirm whether Event 6901 repeats even after a 10-minute cold shutdown; persistent failures require technician string verification followed by SMA warranty RMA exchange.

Recovery Behavior:Locks MPPT Input B or inverter output off permanently once startup boost/sensor diagnostics fail; requires certified SMA hardware replacement.
SCHEMATIC // SMA Sunny Boy Error 6901 — Grid-Tied String Inverter Architecture
PERIMETER: SEALED ENCLOSURE
SMA Sunny Boy Error 6901: PV Array, AFCI & DC Boost Stage System DiagramHV DCACSEALED CHASSIS — PRO ONLYPV Strings & DCMC4 / AFCI / DC SPDDC Switch & FusesMPPT & CoolingBoost / HeatsinkFans & NTC ArrayPower Bridge & DSPIGBT / DC-Link CapsEEPROM / Dual-CPUAC Relays & GridL-N / Freq PLL / SPDIsolator & BreakerPE Earth & RisoRCMU / GFCI / GFDIInsulation ResistanceOptional StorageDC Fuse / BMS CANLV/HV Bus CutoffComms & CT MeterRS485 / Wi-Fi / USBFirmware & ProfileActive Fault ZoneSafety BoundaryFAULT TARGET HIGHLIGHTED
Highlighted Fault Node
PV Array, AFCI & DC Boost Stage
Signal / Power Path
Roof Strings / MC4 / Optimizers -> DC Isolator & MPPT
Safety Access Line
Sealed Chassis — MPPT Input B Boost Stage, Gate Drive & DC Current Sensor

📊 Technical Specification & Trigger Matrix

Official Manual Definition
Startup self-diagnosis detected an internal hardware defect on PV String Input B boost converter or current sensor.
Trigger Threshold
Input B boost circuit voltage or DC current offset fails morning self-check
Recovery Window
Hardware lockout—does not self-heal once boost semiconductors or Hall sensors fail
Subsystem Affected
MPPT Input B Boost Stage, Gate Drive & DC Current Sensor
Warranty Outlook
High—covered under SMA 5–10 year factory product warranty when site wiring fits spec

How SMA Sunny Boy Error 6901 Triggers

Identical to Event 6801 for Input A, SMA Event 6901 (Self-diagnosis: Input B defective) isolates failures inside the secondary MPPT Input B boost stage of dual-tracker Sunny Boy and Sunny Tripower units. Every startup cycle evaluates boost inductor leakage, current-sensor zero balance, and semiconductor health cleanly before permitting export.

Unused Input B Warning vs. Hardware Defect: On installations utilizing only Input A (Input B left empty), Event 6901 still proves the internal DC hardware stage attached to Input B failed startup diagnostics via an internal shorted IGBT/Hall sensor rather than anything on the roof—making serial documentation and RMA dispatch straightforward.

🔀 Hardware & Series Differences

SMA Sunny Boy Single-Phase (SB3.0–7.7-US)
Event 6901 (Self-diagnosis: Input B defective — boost chopper B or Hall sensor failed)

Verify whether Input B actually has rooftop PV strings connected or sits intentionally empty.

SMA Sunny Tripower Commercial (STP TL)
Tracker B boost converter stage fault interrupting solar feed-in

Inspect Input B total paralleled string currents (Isc) against rated datasheet ceilings.

🔍 Observable Symptoms

  • •Red warning LED shines permanently alongside Self-diagnosis: Input B defective (6901) in WebUI.
  • •Zero generation from Input B strings (or full inverter standstill).
  • •Can trigger even when Input B terminals have zero solar cables attached outdoors.

⚙️ Ranked Root Causes

Shorted or failed boost converter MOSFET/IGBT on Input B DC input stageHigh

Heat cycling or surges break semiconductor junctions serving MPPT tracker B.

Drifted Input B Hall-effect current sensor outputting non-zero zero-load readingsHigh

Calibration check flags faulty sensor offset during quiet pre-start checks.

Over-current parallel string loading or loose high-heat Sunclix plug heating Input BMedium

Sustained excessive current degrades internal Input B traces prematurely.

Transient static discharge during storm/twilight startup glitch (rare)Low

Clears permanently if resolved by a clean 10-minute total AC/DC discharge.

🔄 Safe Shutdown & Reset Sequence Flow

Follow strict step order left-to-right
1AC ISOLATE
Switch Solar AC Breaker OFF

Disconnect utility AC safely at your distribution board.

2DC / BATT OFF
Turn Integrated DC Switch to 0 (OFF) for 10 Minutes

Let internal capacitors drain until LEDs stay completely dark.

3RESTORE & BOOT
Restore DC First Then AC; Log If 6901 Returns

Try one cold restart; repeated Event 6901 confirms physical RMA requirement.

⚠️

High-Voltage / Refrigerant Safety Boundary: Pro Service Split

Steps tagged "Homeowner Safe" below are strictly external read-only or external breaker inspections. Steps tagged "Licensed Technician" involve energized DC/AC bus voltages, isolation testing, or sealed refrigerant circuits—never attempt those steps without certification.

External Safe Zone
Display/App • AC/DC Switches • Airflow
● HOMEOWNER PRE-CHECKS STOP HERE
ENCLOSURE BARRIER
400–1000V DC Bus
✕ DO NOT OPEN COVERS
Internal Chassis (Pro)
Bus Capacitors • IGBT • Relays • Riso
⚡ LICENSED DISPATCH REQUIRED

🔧 Interactive Step-by-Step Diagnostic Checklist

Progress: 0 / 4 Completed
1

Perform One Complete 10-Minute AC/DC Cold Reboot

Homeowner Safe

Turn AC breaker OFF then rotate the integrated DC switch to 0 for 10 full minutes before restarting once.

✓ Expected ResultClears rare twilight startup glitches cleanly without dispatches.
→ If Fault PersistsStop rebooting if Event 6901 returns promptly and log exact WebUI/portal messages.
2

Check String A Power Output & Sunny Portal History

Homeowner Safe

Review Sunny Portal generation charts to confirm whether Input B produced kW yesterday or dropped abruptly after a storm.

✓ Expected ResultProvides date/time and weather timeline needed for SMA warranty authorization.
→ If Fault PersistsShare serial plate photo and fault history with a certified SMA installer.
3

Isolate Input B Array Strings & Verify Voc / Polarity / Isolation

Licensed Technician

Safely de-energize AC/DC, unplug Input B Sunclix connectors, verify array Voc, polarity, and insulation values externally, and test boot with Input B open.

✓ Expected ResultPersistent Event 6901 with Input B physically unplugged proves internal inverter fault conclusively.
→ If Fault PersistsRule out external string overcurrent before mounting replacement hardware.
4

Submit SMA Service Replacement Ticket

Licensed Technician

Upload serial info, Input B string test values, and WebUI Event Logbook exports to SMA Service Portal to schedule RMA swap.

✓ Expected ResultReceives verified replacement inverter covering Input B hardware defect.
→ If Fault PersistsCommission new unit cleanly and transfer Sunny Portal monitoring registration.

📋 Ready-to-Send Technician Fault Brief

Completed safe checks without clearing Error 6901? Copy this structured engineering summary for your installer or OEM RMA ticket.

Request Certified Tech Dispatch ↓

🧰 Field Reference: What Your Technician Will Inspect

For homeowner safety, DIY replacement tools are disabled on this fault code. Your certified electrician or technician should bring:

  • •1000V CAT III Multimeter
  • •DC Clamp Ammeter
  • •Sunclix Release Tool
⚠️
Critical Hazard AlertLicensed Electrician Required

Don't Risk High-Voltage Shock with SMA Sunny Boy Error 6901

This fault involves internal bridge or DC intermediate capacitor stages. Under NEC & UL guidelines, probing energized solar conductors can cause lethal arc flash. Get competitive quotes from licensed solar electricians in your postal area:

✓ No obligation quotes✓ Pre-screened NABCEP certified contractors✓ 100% Free dispatch

❓ Frequently Asked Questions

Why did Event 6901 appear when nothing is plugged into Input B?

SMA inverters run internal self-tests across all built-in power stages every morning. If an idle Hall current sensor or boost switch inside Input B fails, Event 6901 triggers even with empty terminals.

Is Event 6901 fixable on site without replacing the inverter?

No. Internal DC boost converter switches and precision current sensors are integrated onto factory-calibrated power assemblies requiring SMA exchange.

Can wet panels trigger SMA Event 6901?

Wet panels normally trigger ground isolation Event 3501 (Insulation resistance) rather than Event 6901, which tracks internal DC boost hardware defects.

Related SMA Sunny Boy Fault Codes

VF
VoltFaults Engineering Review Board✓ Verified Technical Standards• Updated November 2026

Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).

Emergency Installer Dispatch Network

Can't Resolve Your Hardware Fault?

High-voltage DC solar systems and heat pumps require certified technicians. Connect with NABCEP-certified solar electricians and F-Gas certified heat pump specialists in your region.

Free quotes • No commitment • Local certified technicians