Fronius State 102: AC Grid Voltage Too High (Overvoltage Trip)
Affected Models: Fronius Primo, Symo, Eco, Galvo (SnapINverter) & Primo/Symo GEN24 Plus
⚡ Quick Engineering Answer
Fronius • State 102Fronius State 102 indicates that the AC utility grid voltage measured at the inverter output has exceeded the maximum statutory limit defined in your Country Setup (often >253V–264V single-phase). It clears automatically when neighborhood grid voltage drops, though recurring midday trips typically signal street transformer tap issues or high AC cable voltage rise.
📊 Technical Specification & Trigger Matrix
- Official Manual Definition
- AC grid voltage exceeded upper statutory protection limit, pausing solar feed-in to protect home appliances and grid stability.
- Trigger Threshold
- AC grid voltage > configured Country Setup upper ceiling (typically +10% to +15% nominal, e.g., >253V–264V)
- Recovery Window
- Auto-reconnects 60–300s after AC voltage drops back inside permissible range
- Subsystem Affected
- AC Grid Monitoring & Anti-Islanding Relays
- Warranty Outlook
- External utility voltage or AC cable voltage-rise issue (not a hardware defect)
How Fronius State 102 Triggers
As roof solar penetration surges during sunny midday hours, back-feeding power onto local neighborhood distribution lines causes street transformer voltages to float upward. Fronius State 102 (AC voltage too high) activates whenever grid voltage measured at the inverter AC terminals climbs past the configured grid-code trip ceiling (e.g., >253V–264V RMS in 230V regions, or >264V across 240V split-phase markets).
Both SnapINverter (Primo, Symo, Galvo) and GEN24 / GEN24 Plus units treat State 102 as a safety grid-monitoring pause rather than an internal defect: internal grid relays stay open until utility voltage returns safely inside tolerance for the mandated reconnection window (typically 60–300 seconds). Note that long, undersized AC wiring runs between the inverter and main switchboard artificially inflate inverter-terminal voltage ('voltage rise') even when street supply sits within normal limits.
🔀 Hardware & Series Differences
Compare Solar.web L1/L2/L3 AC voltage graphs during peak noon generation to identify which phase trips.
Hybrid GEN24 units can continue PV-to-battery DC charging even while AC export relays remain paused.
🔍 Observable Symptoms
- •State 102 appears reliably between 10:30 AM and 2:30 PM on clear, sunny, mild days when neighborhood consumption is low.
- •Inverter orange/red status LED flashes and AC output drops to 0W before restarting 5–10 minutes later.
- •Often preceded by State 567 (Grid-Voltage Dependent Power Reduction / Volt-Watt derating) right before complete cutoff.
- •Solar production runs steadily on overcast days or early mornings without errors.
⚙️ Ranked Root Causes
Local utility substation transformers sit above nominal 230V/240V when surrounding rooftop arrays export simultaneously.
Exporting high current over thin AC wire adds 5V–10V specifically at inverter terminals.
Tighter European/Australian profiles trip sooner than regional utility operating envelopes.
High-resistance termination adds voltage drop/rise distortion during heavy export.
🔄 Safe Shutdown & Reset Sequence Flow
Follow strict step order left-to-rightLog peak AC grid voltage shown right before State 102 triggered (e.g., 258V–265V).
Avoid forcing manual reboots; relays re-close automatically as soon as utility voltage drops.
Press Enter on SnapINverter display or inspect Solar.web Daily Power Curve for saw-tooth dropouts.
Safe External Scope: Do Not Open Covers or Probe Terminals
All checks below remain strictly outside the sealed enclosure (display apps, breaker sequence, airflow/filter clearances, or external plugs). Never open housing screws or expose live wiring.
🔧 Interactive Step-by-Step Diagnostic Checklist
Review Peak AC Voltage Curves in Fronius Solar.web
Open Fronius Solar.web (or press display buttons safely on SnapINverter) to record exact AC voltage values on L1/L2/L3 during peak midday State 102 dropouts.
Observe Companion State 567 & Appliance Timing
Notice whether State 567 (Volt-Watt derating) logs just before State 102, and shift heavy flexible appliances (hot water heater, pool pump, EV) toward midday hours to absorb surplus export safely.
Collect Timestamped Voltage Logs & Contact Utility / Installer
Save 3–5 days of Solar.web AC voltage screenshots and notify your electricity distributor or solar installer so a licensed electrician can audit switchboard voltage drop and approved Q(U) reactive power settings.
📋 Ready-to-Send Technician Fault Brief
Completed safe checks without clearing State 102? Copy this structured engineering summary for your installer or OEM RMA ticket.
📋 Homeowner Preparation & Read-Only Access Needed
No electrical test instruments or aftermarket tools are required for these checks—have the following ready before starting:
- ✓Fronius Solar.web Mobile App
- ✓Fronius SnapINverter LCD / WebUI Display
- ✓Utility Meter Reference Number
❓ Frequently Asked Questions
Does Fronius State 102 mean my inverter is broken?
No—99% of State 102 events indicate your inverter is functioning properly as a safety guard because neighborhood utility voltage climbed above local grid limits.
Why does State 102 happen mostly around noon on sunny spring or winter days?
Cooler sunny weather produces peak solar generation across neighborhood roofs while household A/C usage is low, pushing local distribution voltage above 253V–260V.
Can my installer raise the overvoltage limit inside Fronius settings?
Only within strict utility distributor rules; however, technicians can enable Volt-Var reactive power or shorten/thicken AC feeder cables to stop nuisance voltage rise.
Related Fronius Fault Codes
Inverter scaled back export power under Volt-Watt rules because local grid voltage rose high.
AC grid voltage dipped below lower statutory safety threshold, halting export until utility voltage stabilizes.
Utility grid or backup generator AC frequency exceeded upper permitted limit, pausing solar feed-in.
AC grid missing or combined grid parameters out of bounds while inverter attempts synchronization.
Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).