Fronius State 105: AC Grid Frequency Too High (Overfrequency Trip)
Affected Models: Fronius Primo, Symo, Eco (SnapINverter) & GEN24 Plus
⚡ Quick Engineering Answer
Fronius • State 105Fronius State 105 means AC mains frequency climbed above your active Country Setup upper ceiling (typically >50.5–52.0 Hz on 50 Hz grids or >60.5 Hz on 60 Hz networks). It recovers automatically when frequency stabilizes, and frequently appears on off-grid backup generators spinning too fast or during deliberate utility microgrid curtailment.
📊 Technical Specification & Trigger Matrix
- Official Manual Definition
- Utility grid or backup generator AC frequency exceeded upper permitted limit, pausing solar feed-in.
- Trigger Threshold
- Utility/generator AC frequency > configured upper Country Setup ceiling (e.g., >51.5–52.0 Hz or >60.5–62.0 Hz)
- Recovery Window
- Auto-reconnects within 60–300s after AC frequency drops back inside standard band
- Subsystem Affected
- Grid Frequency PLL Synchronization Stage
- Warranty Outlook
- Normal grid/generator frequency regulation or deliberate AC-coupled battery charge cutoff
How Fronius State 105 Triggers
Public electrical networks balance supply and demand tightly around nominal 50.00 Hz or 60.00 Hz. When surplus power floods an isolated feeder or diesel backup generator governors run fast under light loads, system frequency climbs upward. Fronius State 105 (AC frequency too high) disconnects solar generation cleanly to uphold anti-islanding regulations and frequency stability.
Before State 105 hits complete disconnection, newer Fronius units operating under active grid codes perform linear power curtailment (State 560). On properties utilizing off-grid GEN24 backup or standalone microgrids (such as Victron AC-coupling or islanded generators), micro-inverters intentionally raise AC frequency up to 51–53 Hz specifically to trigger controlled shutdown of solar production once batteries approach 100% charge.
🔀 Hardware & Series Differences
Usually precedes or follows State 560 over-frequency power reduction during grid transients.
Confirm Microgrid (MG50 / MG60) setup is applied if running on islanded diesel generator or off-grid battery inverter.
🔍 Observable Symptoms
- •State 105 appears repeatedly when running a home backup generator alongside solar panels.
- •Coincides with battery banks reaching 100% full charge on AC-coupled off-grid systems.
- •Logs briefly alongside State 560 during utility switching transients or stormy grid events.
- •Resumes export automatically once grid power or battery SoC drops slightly.
⚙️ Ranked Root Causes
Off-grid battery inverters deliberately shift AC frequency upward to curb excess solar production safely.
Mechanical generator governors overspeed cleanly above tight grid-tied limits without load.
Regional preset mismatch creates constant out-of-frequency lockout from first power-on.
Sudden load shedding across local transmission substations causes momentary frequency overshoot.
🔄 Safe Shutdown & Reset Sequence Flow
Follow strict step order left-to-rightVerify whether off-grid batteries are full or a standby generator is supplying the property.
Inspect active frequency readout (normal ~50.0 Hz or ~60.0 Hz) without opening hardware.
Once frequency normalizes below cutoff threshold, production restarts automatically.
Safe External Scope: Do Not Open Covers or Probe Terminals
All checks below remain strictly outside the sealed enclosure (display apps, breaker sequence, airflow/filter clearances, or external plugs). Never open housing screws or expose live wiring.
🔧 Interactive Step-by-Step Diagnostic Checklist
Confirm Whether Standby Generator or Off-Grid Battery Is Active
Check whether your property is operating on a backup generator or off-grid battery bank at full 100% SoC—intentional frequency shifting routinely triggers State 105 cleanly.
Verify Regional 50 Hz / 60 Hz Standard in System Info
View your active Country Setup label on the inverter WebUI or LCD menu (view-only) to confirm 50 Hz regions do not accidentally run 60 Hz profiles or vice versa.
Log Frequency Spikes for Generator / Installer Tuning
Download frequency telemetry charts from Solar.web showing peak Hz during generator or microgrid runs so an off-grid technician can fine-tune generator governor RPM or verify MG50/MG60 droop parameters.
📋 Ready-to-Send Technician Fault Brief
Completed safe checks without clearing State 105? Copy this structured engineering summary for your installer or OEM RMA ticket.
📋 Homeowner Preparation & Read-Only Access Needed
No electrical test instruments or aftermarket tools are required for these checks—have the following ready before starting:
- ✓Fronius Solar.web Event Telemetry
- ✓Inverter LCD / WebUI Display Access
- ✓Backup Generator Operating Manual (If Off-Grid)
❓ Frequently Asked Questions
Why does Fronius State 105 happen every day around noon on my off-grid battery system?
That is intentional frequency shifting! Once your off-grid battery hits 100% charge, the battery inverter bumps AC frequency above 51.5 Hz so Fronius pauses safely.
Does State 105 indicate damaged solar inverter hardware?
No—it shows the inverter's frequency protection sensors are correctly preventing over-speed energy injection onto unstable utility lines or generators.
Can Fronius run safely on a portable backup generator?
Standard grid profiles frequently reject unstable portable generator Hz; installers must match compatible inverters and apply Microgrid MG50/MG60 settings per off-grid specifications.
Related Fronius Fault Codes
Inverter actively curtailed output power to help stabilize grid frequency above standard over-frequency start point.
AC grid voltage exceeded upper statutory protection limit, pausing solar feed-in to protect home appliances and grid stability.
AC grid missing or combined grid parameters out of bounds while inverter attempts synchronization.
AC grid voltage dipped below lower statutory safety threshold, halting export until utility voltage stabilizes.
Reviewed and verified by the VoltFaults Engineering Standards Team. All diagnostic procedures, safety warnings, and component tests are cross-referenced directly with original manufacturer service documentation and international electrical safety codes (UL 1741, IEEE 1547 & IEC 62109).