Fronius State 567: Grid-Voltage Dependent Power Reduction (Volt-Watt Mode)
Affected Models: Fronius Primo, Symo, Eco & GEN24 Plus
⚡ Quick Engineering Answer
Fronius • State 567Fronius State 567 signals Grid-Voltage Dependent Power Reduction (Volt-Watt Mode)—NOT an emergency backup overload! When afternoon solar exports push street AC voltage high (commonly above ~250V–255V in Australia/Europe), Fronius smoothly reduces export power to prevent complete overvoltage cutoffs (State 102). Review midday AC voltage curves and shift heavy loads to solar noon.
📊 Technical Specification & Trigger Matrix
- Official Manual Definition
- Inverter scaled back export power under Volt-Watt rules because local grid voltage rose high.
- Trigger Threshold
- AC voltage enters Volt-Watt droop band (~250V–255V on 230V/240V lines)
- Recovery Window
- Full kW output resumes automatically as street AC voltage dips back down
- Subsystem Affected
- Volt-Watt Grid Voltage Management
- Warranty Outlook
- Mandatory grid compliance response; external utility/AC wire sizing issue
How Fronius State 567 Triggers
Modern smart grid rules require Volt-Watt Power Quality Response so dense solar suburbs do not spike street voltage to dangerous levels. Instead of switching off suddenly at upper limits (State 102), Fronius State 567 (Grid-Voltage Dependent Power Reduction) trims export kW gently once terminal voltage climbs past regional start points (commonly >250V–255V).
Practical Tip: Running a pool pump, electric vehicle charger, or water heater during sunny midday consumes surplus power locally, lowering household voltage and erasing State 567 losses immediately. Chronic daily clipping typically reflects high street transformer taps or thin AC cables.
🔀 Hardware & Series Differences
Compare L1/L2/L3 AC voltage graphs during clear 11 AM – 2 PM windows.
Delaying battery charging until midday soaks solar peaks without lifting street voltage.
🔍 Observable Symptoms
- •Solar.web alerts log State 567 daily between 11 AM and 2:30 PM on sunny days.
- •Afternoon output plateaus flat without dropping completely to zero (
State 102). - •AC voltage chart stays around ~252V–258V during curtailed midday windows.
- •Curtailment disappears briefly when A/C, water heaters, or EV chargers turn on.
⚙️ Ranked Root Causes
Utility transformers tuned high at 245V idle get pushed over 253V across sunny suburbs.
Small feeder wires lose 6V+ between switchboard and inverter terminals under full export.
Missed opportunity to charge battery at peak voltage noon hours.
Prevents harsh repeated total overvoltage disconnects.
🔄 Safe Shutdown & Reset Sequence Flow
Follow strict step order left-to-rightConfirm whether phase AC voltages sit near 250V–258V precisely during flat output plateaus.
Run hot-water timers, pool pumps, or delay battery charging until 11 AM–2 PM to soak voltage safely.
Share Solar.web voltage screenshots with your power distributor to request transformer tap lowering.
Safe External Scope: Do Not Open Covers or Probe Terminals
All checks below remain strictly outside the sealed enclosure (display apps, breaker sequence, airflow/filter clearances, or external plugs). Never open housing screws or expose live wiring.
🔧 Interactive Step-by-Step Diagnostic Checklist
Confirm Midday AC Voltage Readings & Test Heavy Load Shifting
Review AC voltage charts inside Solar.web between 11 AM and 2 PM safely, and schedule hot-water elements, pool filtration, or EV charging inside midday peaks to lower household grid voltage naturally.
Collect Voltage Proof If Night/Idle Voltage Already Runs High
Check midnight or dawn grid voltage on Solar.web—if street voltage already sits around 245V+ even at midnight with zero solar exporting, submit a formal High Voltage notification to your utility provider.
Request Electrician Volt-Var & AC Feeder Check If Street Voltage Is Normal
If midnight street grid voltage sits cleanly around 230V–238V yet inverter terminals spike past 254V at noon, hire a licensed electrician to verify switchboard AC cable gauge and utility-approved Volt-Var (Q(U)) mode.
📋 Ready-to-Send Technician Fault Brief
Completed safe checks without clearing State 567? Copy this structured engineering summary for your installer or OEM RMA ticket.
📋 Homeowner Preparation & Read-Only Access Needed
No electrical test instruments or aftermarket tools are required for these checks—have the following ready before starting:
- ✓Fronius Solar.web AC Voltage History Logs
- ✓Appliance / Pool Timer Scheduling
- ✓GEN24 / Smart Meter Monitoring View
❓ Frequently Asked Questions
Is Fronius State 567 caused by an overload on my GEN24 emergency backup output?
NO! Officially State 567 stands for Grid-Voltage Dependent Power Reduction (Volt-Watt compliance mode)—not emergency backup overload. It means utility street voltage climbed high (~250V+) so Fronius throttled export to comply with grid codes.
Should I get my installer to disable State 567 Volt-Watt mode?
No—disabling mandated Volt-Watt protection violates utility interconnection contracts and actually triggers harsh complete shutdowns (State 102) costing you even more total energy!
How can I save wasted energy lost during daily State 567 throttling?
Schedule heavy home loads (hot water, EV, pool pump, battery noon-charging windows) between 11 AM and 2 PM—consuming solar before it raises AC street voltage!
Related Fronius Fault Codes
AC grid voltage exceeded upper statutory protection limit, pausing solar feed-in to protect home appliances and grid stability.
Inverter actively curtailed output power to help stabilize grid frequency above standard over-frequency start point.
Inverter proactively lowered maximum AC wattage output to prevent overheating under hot conditions or restricted cooling.
Utility grid or backup generator AC frequency exceeded upper permitted limit, pausing solar feed-in.